Three requirements and steps for charging pile installation

Views : 1022
Update time : 2025-04-15

In response to online messages, charging pile manufacturer Jingneng New Energy has paid attention to and viewed one by one, and asked relatively more basic questions about how to solve the problem of charging pile installation. Today, follow Xiaobian to understand.

Three requirements and steps for charging pile installation

The first step, submit the application and review materials 

Generally speaking, after the owner buys an electric vehicle, the pile manufacturer submits the application materials to the power supply company, and needs to provide a copy of the user's ID card, a confirmation of the charging conditions of the new energy minibus, the property consent installation certificate and the parking space certificate. You should have a fixed parking space, whether it is a property parking space or a rental space of more than 6 months, which is just required.

The second step is installation and construction 

After the manufacturer determines the construction plan, it is the step of installation and construction, according to the different conditions of the community and the location of the garage, the construction time is different, some only need 2 hours to finish, and some may need a whole day to complete the construction.

The third step, acceptance

After the construction is completed, the charging pile manufacturer will go to the power company to report, the power company will go to the site for acceptance, the acceptance will be affixed to the meter, the power company will make the corresponding card, and the charging pile company will receive it to the owner, or the owner will go to the power supply bureau to receive it. Talking about the installation of home charging pile, the installation process will inevitably encounter some problems, some problems are generated by the differences between the user and the power grid company or the property negotiation process, making the installation blocked, and some problems are some can be predicted in advance. For example, some communities allow rental parking Spaces to install charging piles, and some owners choose to purchase parking Spaces before installing charging piles without understanding them. There are also some old residential properties to consider the capacitive capacity of the entire community does not allow the installation of charging piles, so it is necessary to go to the property in advance to understand the situation and communicate well.

Related News
Read More >>
How long does it take to charge an electric car ? How long does it take to charge ···
2024-09-23
How long does it take to charge an electric car? In this article we will consider the time to charge for domestic charge···...
DC Fast Charging CCS type 2 plug DC Fast Charging CCS type 2 plug
2024-09-23
Shanghai Mida Electric Vehicle Power Co., Ltd. is a well-known brand that produces numerous electric vehicle products in···...
The high-voltage and high-current supercharging pile is the future development trend of the world The high-voltage and high-curren···
2024-11-22
Trend 1: V2G Technology and "virtual Power Plants"Virtual power plant is not a power station in the real sense···...

Leave Your Message